Steel GI pipe class b class c (galvanized pipe)
Delivery term:The date of payment from buyers deliver within days-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2017-10-09 10:24
-
Browse the number:
207
+
Tianjin Brilliant International Steel Co. Ltd
- Contactaixin:
Contactaixin:
brilliantsteel(Mr.)
-
Email:
telephone:

-
Area:
Beijing
Address:Building the Village of Baoxiang, Rhubarb, Wuqingqu, Tianjin, China (301800)
- Website:
+
Model Number: Jess-GI pipe-003
Brand Name: Brilliant
Key Specifications/Special Features:
Brilliant group galvanized steel pipe:Products details: Place of origin: Tianjin, China (Mainland)Grade: Q195-Q345, Q195, Q215, Q235, Q345Application: structure pipe, machinestructure, building and construction and moreAlloy or not: non-alloy
| Size | OD:1/4" -24" (5.0mm-716mm) Wall Thickness:0.5mm-7.5mm Length:5.8m, 6m, 11.8m |
| Steel material | Q195 → SS330,ST37,ST42 Q235 → SS400,S235JR Q345 → S355JR,SS500,ST52 |
| Standard | ASTM A53/Grade A/B, BS1387-1985, BS EN 10219: 2006,ISO 65-1981,JIS G444:2004 STK400 |
| Zinc Coating | 120g/m2(20m),270g/m2(40m),400(60m),500(70m),550(80m) |
| Usage | 1)low pressure liquid, water, gas, oil, line pipe 2)construction 3)fence, door pipe |
| Ends | 1) Plain 2) Beveled 3) Thread with Coupling or cap 4) Chamfer 5) Groove 6) Screw |
| End Protector | 1) Plastic pipe cap 2) Iron protector |
| Surface Treatment | 1) Bared 2) Black Painted (varnish coating) 3) Galvanized 4) Oiled 5) PE, 3PE, FBE, corrosion resistant coating, Anti corrosion coating. |
| Technique | Electronic Resistance Welded (ERW ) Electronic Fusion Welded (EFW) Double Submerged Arc Welded (DSAW) |
| Welded Line Type | Longitudinal |
| Section Shape | Round, Round, Square, Rectangular |
| Inspection | With Hydraulic Testing, Eddy Current , Infrared Test |
| Package | 1) Bundle 2) Bags |
| Delivery | 1) Container 2) Bulk carrier |
| Delivery Time | 7-15working days |
Shipping Information:
- FOB Port: China (Mainland)
- Lead Time: 7 - 15 days
Main Export Markets:
- Asia
- Australasia
- Central/South America
- Eastern Europe
- Mid East/Africa
- North America




